Making a list – checking it twice

wpid-DSC_2210.jpg

Since latey I seem to have the attention span of a five year old knitwise, I figure I need to make a list of the things I plan to knit between now and New Year’s. It’s not a definite list and I can make other things that’s not on the list if I want to but I should at least consult the list (oh, that was a line in my French textbook in high school, “eller consulte sa liste”) before I cast on something new. I will probably add things and remove things and have a very dynamic list. I will Julle will figure out a way to put the list up on the blog so I don’t have to make a whole new post every time I make a change (or finish something, that could actually happen too). We’ll see.

So far though, here is my list. It has to be cryptic because, duh, there is a Christmas somewhere (not really somewhere, actually very well placed and has been so for as long as people has celebrated Christmas) between now and New Year’s.

– Poción.
– Fall MKAL.
– First Yarn Club pattern (September).
– Sonar shawl.
– Second Yarn Club pattern (November).
– Toddler sweater.
– Jo Pride Hoodie.
– Julle’s hat. We looked at patterns and yarn yesterday and today Julle has made his first yarn decision and purchase by himself. He’s pretty proud. So am I.
– Yarn from Norway.
– Sky Blue wristwarmers.
– Double-Breasted Pullover.
– Malabrigo Rios.
– Söderköping.
– Bigger on the inside
– Eskimo.
– Sleeve.

I think that’s it for now. In total 23 projects. The plan for this evening is to make a few centimeters on that Flimsy Princess and also to reknit the band on my beret. Perhaps also to wind three skeins of merino too. But first, dinner!